PHYSICAL INFRASTRUCTURE

Structured Cabling and Low-Voltage Infrastructure

We plan the routing of copper and fiber runs, cabinet layout, endpoints and the labeling scheme at the start of the project. At handover we report which port each run goes to and which test it passed.

Planned routes, labeled ports, tested runs

A run with a label and a test record is found faster during faults and moves.

SERVICE SCOPE / 01

Runs are tested and documented

In new office, factory and warehouse projects, the number of ports alone isn’t enough. Growth headroom, PoE load, the fiber backbone, environmental conditions and test reports are planned from the start.

01

Copper

Suitable category and link measurement

02

Fiber

Strand plan and suitable termination

03

Cabinet

Patch panels, power and layout

04

Handover

Port labels and test records

STANDARDS / 02

The cable’s length and termination matter as much as its category

Structured cabling is designed to standards such as TIA-568 and ISO/IEC 11801. The total length of a copper channel must not exceed 100 meters (90 meters of permanent link plus patch cords). The category doesn’t stretch this limit.

MediumTypical useNote
Cat6 U/UTPDesk, camera and access point connections10GBASE-T support depends on the components of the installed channel, alien crosstalk and the test result; about 55 m is a conditional upper value
Cat6AWi-Fi 6/7 access points, high PoE loadDesigned for 10GBASE-T over a 100 m channel. With PoE, heating depends on conductor gauge, cable construction, bundle size, ambient temperature and manufacturer values
OM3 / OM4 multimode fiberIn-building backbone, between cabinetsSpeed and distance are determined by the optical module standard, fiber type, number of connections and loss budget
OS2 single-mode fiberBetween buildings, long distanceUsed for long distances; achievable distance depends on the optical module and loss budget
ENGINEERING APPROACH / 03

The project isn’t just pulling cable

The cabling project is prepared on architectural plans, from outlet placement to cabinet layout. At handover, every run is documented with its test result and label.

01

Route and environment

Cable pathways, electromagnetic effects, fire and physical protection requirements are assessed for the project.

02

Termination and layout

Patch panels, outlets, racks and port labels are tied to a single, consistent naming scheme.

03

Testing and handover

The test scope is set by the job specification. A simple continuity test and copper link certification are different jobs; for fiber, end-to-end loss measurement and OTDR event analysis are reported separately as well.

LOW VOLTAGE / 04

Cameras, access control and other systems in the same plan

IP cameras, card access, intercom and public address systems now mostly run over the network. We handle them all in the same project and place security systems in separate VLANs in the segmentation plan. We restrict access to the camera and recording system with rules between network segments.

Covered in the same project

  • IP camera and network video recorder (NVR) connections
  • Card access and turnstile infrastructure
  • Intercom and public address systems
  • Building automation and sensor connections
  • Ceiling outlets for access points
CONCRETE DELIVERABLES / 05

What will you have at the end of the cabling work?

Labeled cabling documented with test reports, a cabinet layout plan and port mapping tables.

A documented, verifiable result

01

As-built cable route and port plan

02

Patch panel / endpoint mapping list

03

Test reports matching the project scope

04

Cabinet and expansion reserve documentation

FREQUENTLY ASKED QUESTIONS / 06

Let’s clarify a detail

If your question is specific to your network, write to us; we’ll look at the current setup and give you a clear answer.

01

Can existing cabling infrastructure be reused?

First the physical condition, required speed, PoE capacity and test results are assessed. A run that passes the test isn’t ripped out unnecessarily.

02

Can you measure the condition of our existing cabling?

Yes. Existing runs are measured with a certification tester, and which run meets which application class is reported based on the test result. Problem runs are re-terminated or replaced.

03

Should we choose Cat6 or Cat6A?

For desk connections, Cat6 is often enough. We recommend Cat6A for points with new-generation access points, high PoE load or a 10 Gbit/s need.

04

Can work areas be used during cabling?

The work is done floor by floor or section by section. Dusty and noisy work can be scheduled outside working hours.

ERETEK NETWORK

Let’s plan the cabling of your new building or existing office

Share your architectural plans; let’s work out outlet, cabinet and backbone placement together.